Home > Products > Prefabricated Steel Structure Building >
Pre-engineered Galvanized Steel Frame Factory Workshop with Insulated Wall Panels

Pre-engineered Galvanized Steel Frame Factory Workshop with Insulated Wall Panels

Place of Origin:

china

Brand Name:

China CT steel structure

Certification:

SGS

Model Number:

workshop006

Chat Now
Request A Quote
Product Details
Size Range:
300㎡-30000㎡
Surface Treatment:
Hot-dip Galvanized (Min. 600g/m²) Or Premium Anti-corrosion Painting
Main Frame Material:
Q355 Q235
Primary Frame:
Welded H-section Steel / Hot-rolled Steel (ASTM A36 Or S235JR Equivalent)
Roof & Wall Panels:
Sandwich Panels (Rock Wool/PU/EPS) Or Single Corrugated Steel Sheets
Fire Resistance:
Fireproof Treatment Available
Payment & Shipping Terms
Minimum Order Quantity
1000Square meters
Price
USD40-60 Square meters
Packaging Details
Single package size: 1200 x 200 x 200 cm
Delivery Time
3-4weeks
Payment Terms
L/C,T/T
Supply Ability
400,000 Tons/ Year
Product Description
Pre-engineered Galvanized Steel Frame Factory Workshop with Insulated Wall Panels

CT Steel Structure is a professional manufacturer and exporter of prefabricated steel structure buildings in China. We specialize in customized steel workshops, steel warehouses, and multi-story steel buildings. Equipped with advanced production equipment and an experienced technical team, we guarantee stable quality, precise processing, and fast delivery.

We provide comprehensive one-stop services including design, production, and overseas installation guidance. Our products are widely exported to Southeast Asia, Africa, the Middle East, and other international markets.

Technical Specifications
Component Detailed Specifications
Primary Frame Welded H-section Steel / Hot-rolled Steel (ASTM A36 or S235JR equivalent)
Surface Treatment Hot-dip Galvanized (Min. 600g/m²) or Premium Anti-corrosion Painting
Roof & Wall Panels Sandwich Panels (Rock Wool/PU/EPS) or Single Corrugated Steel Sheets
Design Standards GB/T, AISC, Eurocode, or Local Building Codes Compliance
Key Advantages
  • Exceptional Durability: Our high-tensile steel frames are resistant to termites, fire, and corrosion.
  • Rapid Deployment: Modular design allows for 30-50% faster installation.
  • Custom Engineering: Tailored CAD/Tekla designs to optimize material usage.
  • Eco-Friendly: Over 90% of materials are fully recyclable.
Pre-engineered steel frame factory workshop exterior view Interior view of steel structure workshop with crane system

Heavy-duty steel-structure workshop designed for production-line and heavy-machinery placement.

  • We install crane beams to fit overhead travelling cranes as your requirement.
  • High-strength Q355B H-beam ensures stable bearing capacity for long-time use.
  • We provide one-stop full-chain services including design, production and overseas installation guidance.
  • Bolt-connected structure shortens your whole construction period greatly.
Primary Applications
  • Superior Service Life: Our high yield steel structures provide solid protection against termite erosion, flame risks and corrosive deterioration.
  • Efficient On-site Assembly: Adopting modular structural layouts can slash the whole installation cycle by 30%-50%.
  • Customized Structural Solutions: Bespoke CAD and Tekla drafting schemes minimize material loss and boost raw material utilization rates.
  • Green Building Attribute: A minimum of 90% of all construction parts can undergo full recycling once they reach the end of their service cycle.
Frequently Asked Questions
Q1: How long does it take to deliver a steel structure building?
A: Generally, the production cycle is 30-45 days after the design is finalized. Shipping time depends on the destination port, typically ranging from 15 to 40 days.
Q2: Can your steel buildings be customized to specific local building codes?
A: Yes, our engineering team can design the structure to meet specific local wind speeds, snow loads, and seismic requirements according to international standards.
Q3: What maintenance is required for a steel structure?
A: Steel buildings require very low maintenance. Periodic inspections of the paint or galvanized coating and clearing of roof gutters are usually sufficient to ensure a lifespan of over 50 years.

Send your inquiry directly to us

Privacy Policy China Good Quality Steel Structure Workshop Supplier. Copyright © 2025-2026 China CT Steelstructure Co.,Ltd . All Rights Reserved.