Brief: Looking for a straightforward way to build a durable, large-scale workshop quickly? This video provides a walkthrough of our high-intensity steel structure, showcasing its easy assembly process, superior seismic and wind resistance, and the factory-controlled quality that ensures a 30-50% faster build time compared to traditional methods.
Related Product Features:
Standardized pre-fabricated components enable fast on-site assembly, increasing construction efficiency by 30-50%.
Excellent seismic and wind resistance due to steel's ductility and energy absorption capabilities.
Constructed from high-strength materials like Q235B and Q355B China standard steel for durability.
Roof and wall insulation panels available in EPS, Rock wool, or PU sandwich for thermal efficiency.
Features C or H section steel purlins and options for sliding or rolling doors.
Galvanized steel sheets (0.2mm-0.6mm) provide corrosion resistance and longevity.
Suitable for industrial projects and commercial real estate with strict time requirements.
Factory-direct sourcing saves 30-40% compared to local market prices.
FAQs:
How does the steel structure shorten the construction period?
Components are pre-fabricated in the factory for quality control, and on-site work involves only assembly and connection, eliminating curing periods required by concrete structures, which increases efficiency by 30-50%.
What makes this structure suitable for seismic and high-wind areas?
The steel's ductility and toughness allow it to absorb energy through deformation during earthquakes or typhoons, reducing brittle failure risks and enhancing safety over traditional structures.
What materials are used in the construction?
It uses Q235B or Q355B standard steel for the main frame (H beam), with options for EPS, Rock wool, or PU sandwich panels for insulation, and galvanized steel sheets for roofing and walls.