Environmental Protection Galvanized Metal Material Steel Structure Workshop
Product Description:
The material recovery rate after the demolition of steel structures exceeds 90%, and the amount of construction waste generated per square meter is only 1/3 of that of concrete structures. EU research shows that the use of steel structures can reduce carbon emissions throughout the life cycle of buildings by 15% - 20%. Today, with increasing awareness of environmental protection, the sustainable development of the construction industry has attracted much attention. After the demolition of concrete buildings, a large amount of construction waste is difficult to recycle, causing great pressure on the environment. The main material of steel structure buildings, steel, is recyclable, and the demolished steel can be reprocessed and put into use again, greatly reducing resource waste and environmental pollution. In addition, during the construction process of steel structures, energy consumption and carbon emissions can also be reduced due to the short construction period and small on-site workload. For example, in some cities 'old city renovation projects, the use of steel structures can quickly complete construction and reduce the impact on the lives of surrounding residents. At the same time, its environmental protection advantages are also in line with the concept of sustainable urban development.
Product Advantages
1.Low maintenance costs: Steel is resistant to corrosion and wear, making the steel structure factory less likely to be damaged during use
2.High degree of industrialization and short construction period: Steel components are produced in factories, which can achieve large-scale and high-precision production. Using this construction method and on-site assembly can effectively shorten the construction period, reduce construction costs, and create economic benefits for financial investment. Good conditions.
3.Short construction period: Due to the high degree of prefabricated steel, assembly and installation work on the construction site is relatively simple, greatly shortening the construction period
4.Seismic performance: Steel structure factories have good seismic performance and can withstand extreme weather
Product Attributes
|
Remark | |
Brace | ordinary, high strength bolt | |
Main frame | H beam | |
Roof &wall | EPS,Rock wool , PU sandwich | |
Insulation panel | EPS,Rock wool , PU sandwich | |
Purlin | C or H section steel purlin | |
Door | Sliding or rolling door | |
Sheet | 0.2mm-0.6mm galvanzied steel sheet | |
Material | Q235B,Q355B China standard steel |
Transport Specifications
Package Size | 100.00cm * 100.00cm * 100.00cm |
Package Gross Weight | 100.000kg |
Product Use
1.Logistics storage: Steel structures are very suitable for building logistics storage buildings, such as steel structure warehouses and steel structure factory sheds, due to their light weight, high strength, strong wind and earthquake resistance, and good structural performance.
2.Aquaculture: Aquaculture steel structure plants include poultry steel structure breeding plants and livestock steel structure breeding plants. The poultry steel structure breeding factory can be subdivided into: steel structure chicken house, steel structure duck house and steel structure goose house; the livestock steel structure breeding factory can be divided into: steel structure pig house, steel structure sheep house, steel structure cow house and steel structure pasture
3.Large-span structure: Large-span structures can give full play to the advantages of high strength and light deadweight of steel structures. For example, gymnasiums, exhibition centers, hangars, theaters, etc.
Product Picture
Company Introduction
Since its establishment in 2004, the company covers an area of 30 hectares and has an annual output of 200,000 tons. It has more than 500 well-trained employees and more than 100 professional design teams, after-sales service teams and many advanced equipment. We pride ourselves on providing high-quality, customizable and environmentally friendly products that also meet the diverse needs of our customers around the world. "Customers trust and preferred brand supplier" is the goal pursued by our company, and we always strictly demand ourselves with this goal. We always adhere to the development idea of "providing the best products at the most reasonable prices, the most complete services" and make unremitting efforts towards the vision of "steel structures help the world a better place"!
The quality control measures of steel structure project are as follows:
1,Strengthen the management of technical personnel
In the construction process of the construction site, the construction personnel occupy the main position in the steel structure operation.In this case, it is necessary to carry out specialized management for the participants of steel structure projects.In the actual management of steel structure project participants, it is found that the actual management work often fails to achieve the expected effect.Firstly, due to the uneven level of professional knowledge and comprehensive quality of the construction personnel involved in steel structure construction, they are not specialized steel structure construction personnel.Secondly, there are many problems in the management of steel structure construction personnel.The employees have loose attitude and poor discipline, which is not easy to be managed in a unified way.Facing this problem, the construction unit should formulate a corresponding management system to restrain them, and should not use conventional management methods.In addition, the pre-service education and training of employees should be strengthened to give full play to the enthusiasm of employees so that they can naturally comply with the rules and regulations.
2, improve the construction control mechanism
In the process of engineering construction, more attention should be paid to the construction of construction quality control mechanism, to ensure the overall quality of engineering construction by perfecting the construction mechanism.First of all, the relevant units should improve the existing construction quality management mechanism, combine the problems that may occur in different construction links, and establish corresponding management and processing mechanisms.Secondly, pay attention to the construction supervision of steel structure.In the process of steel structure construction, many different types of problems may be encountered, and the corresponding processing mechanisms may be different.In order to save the construction time and reduce the construction difficulty, some construction personnel may adopt unreasonable construction methods in the construction process, but these methods cannot meet the construction requirements.Under the supervision of the supervisory unit.All the work can be carried out scientifically and reasonably, the probability of non-standard construction problems is greatly reduced, and the overall quality of the steel structure can be effectively guaranteed.The construction party should establish a sound supervision and management mechanism, encourage the relevant construction personnel to supervise each other, cultivate their sense of crisis and rigorous work attitude, and ensure the rationality of construction.
3,Strengthen construction material management
The quality of materials is directly related to the construction quality and is an important content of construction quality control.In the construction of steel structure project, the cost of steel structure material is very high.Strengthening the construction material management reduces the construction cost while ensuring the subsequent steel structure construction activities are carried out in an orderly manner.This requires comprehensive consideration of construction needs and selection of high quality and inexpensive materials.Specialists conduct in-depth market research, compare and analyze the materials, lay the foundation for more orderly implementation of subsequent steel structure construction activities, and effectively improve the construction quality of steel structure projects.
4,Strengthen the quality control of on-site steel structure components
At the same time, the quality control of on-site steel structure components should be strengthened.First of all, check the samples provided by the permanent representatives and supervisors.If any problem is found, the factory should be notified at one time for correction and to ensure the quality of steel structure components can be transported.On the other hand, the steel structural members need to be inspected by the quality inspector of the supervisory unit upon arrival at the site.
transport
FAQ
1. Are you manufacture factory or trading company?
We are manufacture factory, located in Qingdao city, near to Qingdao port. And we have total 7 workshops from steel structure to wall and roof sheet.
2. Can you provide free design?
Yes, we have 10 senior engineer with rich experience. You only need to give me youridea, we will design for you with free.
3. Can you offer competitive prices?
If you have no special requirement for the material, we all use materials from big material manufacture companies. We also can design it according to your requirement. But no matter what kind of quotation mode, offering the reasonable
price is our business objective.
4. How to install? Can you provide engineer to help?
We will provide the detail installations , like the CAD, 3D tekla, etc. Or we will provide the engineers to help according to your requirement.
5. Can I have a visit to your factory before the order?
Why not? Welcome to visit our factory. You can fly to Fujian Quanzhou Airport, then we will pick you up at the airport, hotel booking service is available.
6. ls your price competitive compared with other companies?
A:Our business objectives are to give the best price with same quality and best quality with the same price. We will do everything we can to reduce your cost and guarantee you get the best product that you paid for.
7. Do you accept container loading inspection?
A:You are welcomed to send an inspector, not only for the container loading, but any time during theproduction time.
8. Do you offer designing service for us?
A:Yes, we could design full solution drawings as your requirements.By using Auto CAD,PKPM ,3D3S,Tekla Structures (X steel) etc., we can design complex industrial building like office mansion, super marker, auto dealer shop,shipping mall, 5 stars hotel.
9.What is the delivery time?
A:Delivery time depends on order quantities.In general, the delivery time to nearest seaport in China will be 30 days after receiving deposit.
10.How can you get a quotation for your projects?
A:You can contact us by email, phone, TM, WhatsApp and so on 24*7 and you will get reply within 8 hours. Firstly, please send us your project details and your requirements. Then we will design accordingly, free of charge.Afterwards, please check and confirm whether you like the drawings. If not, we shall get the drawings revised until your confirmation.
Send your inquiry directly to us