Place of Origin:
china
Brand Name:
China CT steel structure
Certification:
SGS
Model Number:
office001
Earthquake Resistant Stable Commercial Steel Structure High Rise Building Office
Product Description:
The floor-to-ceiling frames in the office area form a geometric opposition with the steel columns, and the bolt joints in the conference room are displayed like sculptures. When a typhoon passes through the city, the damper buried deep underground resonates with the steel structure core tube, controlling the swing amplitude to between millimeters. In the dusk, the steel frames inside the building are outlined with silver outlines by lights. Those steel members that were once prefabricated in the factory are now using cold metal texture to support the dreams of hundreds of people in the clouds and the soft sound of keyboards.
Product Advantages
1.Good sustainability: Since steel can be recycled and reused, materials can be reused after construction is completed. This not only reduces the consumption of natural resources, but also benefits environmental protection. At the same time, the lightweight design of steel office buildings reduces land occupation and is conducive to the sustainable development of the city.
2.Strong structural stability: Steel office buildings have strong structural stability and earthquake resistance. Steel is a building material with high strength and good rigidity and can withstand large loads, making office buildings better safe in natural disasters such as earthquakes
3.Fast construction speed: Due to the high manufacturing precision of steel, components can be prefabricated in the factory, reducing on-site construction time. Moreover, the steel construction process is simple and efficient, reducing the risk of construction delays
Product Attributes
Column & Beam | Welded or Hot rolled H-section |
Main Steel | Q355, Q235, Q355B, Q235B, etc. |
Connection method of steel structure | Welding connection or bolt connection |
Anti-rust protection | Hot-dip galvanized or anti-rust painting |
Purlin and girts | Cold-rolled C or Z steel, Q355 or Q235 |
Door | Rolled up door or Sliding door |
Wall & Roof | Sandwich panel or steel sheet. |
Surface | Hot-dip galvanized or painted |
Window | Plastic steel or Aluminum alloy window |
Transport Specifications
Package Size | 100.00cm * 100.00cm * 100.00cm |
Package Gross Weight | 100.000kg |
Product Use
Office space: The main purpose of steel structure high-rise office buildings is to provide modern office space for enterprises. This building form usually has efficient internal layout, good natural lighting and ventilation conditions, and an advanced intelligent management system to meet various needs of the company's daily operations
2.Multi-functional composite: In addition to basic office functions, steel structure high-rise office buildings often integrate multiple functional areas such as meetings, reception, and leisure. These facilities help improve employee efficiency and satisfaction, while also meeting customer visits and business negotiations.
3.Commercial supporting services: In some highly comprehensive high-rise steel structure office buildings, commercial supporting services, such as catering, retail, fitness, etc., will also be set up. These supporting facilities not only facilitate the staff in the office building, but also attract external customers, forming a good business atmosphere
Product Picture
Company Introduction
China CT Steel Structure Group Co., Ltd is a comprehensive industrial group that integrates steel structure research and development, design, manufacturing, production, and installation. Since its establishment in 2004, it coversan area of approximately 300000 square meters and produces 200000 tons of steel structures annually. We have over 500 well-trained employees, more than 100 professional design teams, after-sales service teams, and many advanced equipment.
The company has 30 steel structure production lines, specializing in the design, manufacturing, and installation of industrial and civil buildings such as steel structure factories, warehouses, high-rise steel structure buildings, office buildings, exhibition,halls, sports halls, parking garages, prefabricated houses, and agricultural projects. We are committed to providing customers with innovative solutions that not only meet their expectations, but also exceed them.
The quality control measures of steel structure project are as follows:
1,Strengthen the management of technical personnel
In the construction process of the construction site, the construction personnel occupy the main position in the steel structure operation.In this case, it is necessary to carry out specialized management for the participants of steel structure projects.In the actual management of steel structure project participants, it is found that the actual management work often fails to achieve the expected effect.Firstly, due to the uneven level of professional knowledge and comprehensive quality of the construction personnel involved in steel structure construction, they are not specialized steel structure construction personnel.Secondly, there are many problems in the management of steel structure construction personnel.The employees have loose attitude and poor discipline, which is not easy to be managed in a unified way.Facing this problem, the construction unit should formulate a corresponding management system to restrain them, and should not use conventional management methods.In addition, the pre-service education and training of employees should be strengthened to give full play to the enthusiasm of employees so that they can naturally comply with the rules and regulations.
2, improve the construction control mechanism
In the process of engineering construction, more attention should be paid to the construction of construction quality control mechanism, to ensure the overall quality of engineering construction by perfecting the construction mechanism.First of all, the relevant units should improve the existing construction quality management mechanism, combine the problems that may occur in different construction links, and establish corresponding management and processing mechanisms.Secondly, pay attention to the construction supervision of steel structure.In the process of steel structure construction, many different types of problems may be encountered, and the corresponding processing mechanisms may be different.In order to save the construction time and reduce the construction difficulty, some construction personnel may adopt unreasonable construction methods in the construction process, but these methods cannot meet the construction requirements.Under the supervision of the supervisory unit.All the work can be carried out scientifically and reasonably, the probability of non-standard construction problems is greatly reduced, and the overall quality of the steel structure can be effectively guaranteed.The construction party should establish a sound supervision and management mechanism, encourage the relevant construction personnel to supervise each other, cultivate their sense of crisis and rigorous work attitude, and ensure the rationality of construction.
3,Strengthen construction material management
The quality of materials is directly related to the construction quality and is an important content of construction quality control.In the construction of steel structure project, the cost of steel structure material is very high.Strengthening the construction material management reduces the construction cost while ensuring the subsequent steel structure construction activities are carried out in an orderly manner.This requires comprehensive consideration of construction needs and selection of high quality and inexpensive materials.Specialists conduct in-depth market research, compare and analyze the materials, lay the foundation for more orderly implementation of subsequent steel structure construction activities, and effectively improve the construction quality of steel structure projects.
4,Strengthen the quality control of on-site steel structure components
At the same time, the quality control of on-site steel structure components should be strengthened.First of all, check the samples provided by the permanent representatives and supervisors.If any problem is found, the factory should be notified at one time for correction and to ensure the quality of steel structure components can be transported.On the other hand, the steel structural members need to be inspected by the quality inspector of the supervisory unit upon arrival at the site.
transport
FAQ
1. Are you manufacture factory or trading company?
We are manufacture factory, located in Qingdao city, near to Qingdao port. And we have total 7 workshops from steel structure to wall and roof sheet.
2. Can you provide free design?
Yes, we have 10 senior engineer with rich experience. You only need to give me youridea, we will design for you with free.
3. Can you offer competitive prices?
If you have no special requirement for the material, we all use materials from big material manufacture companies. We also can design it according to your requirement. But no matter what kind of quotation mode, offering the reasonable
price is our business objective.
4. How to install? Can you provide engineer to help?
We will provide the detail installations , like the CAD, 3D tekla, etc. Or we will provide the engineers to help according to your requirement.
5. Can I have a visit to your factory before the order?
Why not? Welcome to visit our factory. You can fly to Fujian Quanzhou Airport, then we will pick you up at the airport, hotel booking service is available.
6. ls your price competitive compared with other companies?
A:Our business objectives are to give the best price with same quality and best quality with the same price. We will do everything we can to reduce your cost and guarantee you get the best product that you paid for.
7. Do you accept container loading inspection?
A:You are welcomed to send an inspector, not only for the container loading, but any time during theproduction time.
8. Do you offer designing service for us?
A:Yes, we could design full solution drawings as your requirements.By using Auto CAD,PKPM ,3D3S,Tekla Structures (X steel) etc., we can design complex industrial building like office mansion, super marker, auto dealer shop,shipping mall, 5 stars hotel.
9.What is the delivery time?
A:Delivery time depends on order quantities.In general, the delivery time to nearest seaport in China will be 30 days after receiving deposit.
10.How can you get a quotation for your projects?
A:You can contact us by email, phone, TM, WhatsApp and so on 24*7 and you will get reply within 8 hours. Firstly, please send us your project details and your requirements. Then we will design accordingly, free of charge.Afterwards, please check and confirm whether you like the drawings. If not, we shall get the drawings revised until your confirmation.
Send your inquiry directly to us