Place of Origin:
china
Brand Name:
China CT steel structure
Certification:
SGS
Model Number:
workshop006
China Exports Customizable Color Large Span Steel Structutre Workshop
Product Description:
The steel structure factory building is an industrial building with steel as the main load-bearing structure. It has the characteristics of high strength, fast construction, and flexible space. It is widely used in machinery manufacturing, warehousing and logistics, automobile manufacturing, aerospace and other fields.
Product Advantages
1.Prefabricated production, rapid assembly on site:
2.Large span and high clearance design:
3.Strong earthquake and wind resistance:
The steel has good toughness and strong ductility, can withstand large deformation, and has a seismic fortification intensity of 7 - 9 degrees, suitable for earthquake-prone areas. For example, the damage rate of steel structures during the Wenchuan earthquake was much lower than that of concrete structures.
4.Low-carbon, energy-saving, recycling:
The construction process has less pollution, and construction waste is reduced by 90% compared with traditional processes, which is in line with the concept of green building.
Product Attributes
|
Remark | |
Brace | ordinary, high strength bolt | |
Main frame | H beam | |
Roof &wall | EPS,Rock wool , PU sandwich | |
Insulation panel | EPS,Rock wool , PU sandwich | |
Purlin | C or H section steel purlin | |
Door | Sliding or rolling door | |
Sheet | 0.2mm-0.6mm galvanzied steel sheet | |
Material | Q235B,Q355B China standard steel |
Transport Specifications
Package Size | 100.00cm * 100.00cm * 100.00cm |
Package Gross Weight | 100.000kg |
Product Use
1. Heavy industry Machinery manufacturing: For example, machine tool processing and mining equipment production workshops need to withstand crane loads (such as bridge cranes of more than 20 tons) and equipment vibration. Metallurgical and chemical industry: In high-temperature and high-load environments (such as steel-making workshops and chemical reaction workshops), structures need to be resistant to high temperatures and corrosion.
2. Light and precision industries Electronic/food workshop: A clean environment is required. The steel structure can quickly build a dust-free workshop, and the color steel plate wall is used to achieve sealing and dustproof. Logistics warehousing: High clearance, long-span requirements (such as three-dimensional warehouses, sorting centers), convenient for forklift operations and rack installation.
3. special industries Aerospace: Ultra-large factories (such as aircraft assembly workshops), with a span of more than 100 meters, meet special processes such as aircraft take-off and landing simulation. Energy field: For example, wind power equipment manufacturing workshops and photovoltaic module production lines require flexible layout and rapid production.
Product Picture
Company Introduction
China CT Steel Structure Group Co., Ltd is a comprehensive industrial group that integrates steel structure research and development, design, manufacturing, production, and installation. Since its establishment in 2004, it coversan area of approximately 300000 square meters and produces 200000 tons of steel structures annually. We have over 500 well-trained employees, more than 100 professional design teams, after-sales service teams, and many advanced equipment.
The company has 30 steel structure production lines, specializing in the design, manufacturing, and installation of industrial and civil buildings such as steel structure factories, warehouses, high-rise steel structure buildings, office buildings, exhibition,halls, sports halls, parking garages, prefabricated houses, and agricultural projects. We are committed to providing customers with innovative solutions that not only meet their expectations, but also exceed them.
The quality control measures of steel structure project are as follows:
1,Strengthen the management of technical personnel
In the construction process of the construction site, the construction personnel occupy the main position in the steel structure operation.In this case, it is necessary to carry out specialized management for the participants of steel structure projects.In the actual management of steel structure project participants, it is found that the actual management work often fails to achieve the expected effect.Firstly, due to the uneven level of professional knowledge and comprehensive quality of the construction personnel involved in steel structure construction, they are not specialized steel structure construction personnel.Secondly, there are many problems in the management of steel structure construction personnel.The employees have loose attitude and poor discipline, which is not easy to be managed in a unified way.Facing this problem, the construction unit should formulate a corresponding management system to restrain them, and should not use conventional management methods.In addition, the pre-service education and training of employees should be strengthened to give full play to the enthusiasm of employees so that they can naturally comply with the rules and regulations.
2, improve the construction control mechanism
In the process of engineering construction, more attention should be paid to the construction of construction quality control mechanism, to ensure the overall quality of engineering construction by perfecting the construction mechanism.First of all, the relevant units should improve the existing construction quality management mechanism, combine the problems that may occur in different construction links, and establish corresponding management and processing mechanisms.Secondly, pay attention to the construction supervision of steel structure.In the process of steel structure construction, many different types of problems may be encountered, and the corresponding processing mechanisms may be different.In order to save the construction time and reduce the construction difficulty, some construction personnel may adopt unreasonable construction methods in the construction process, but these methods cannot meet the construction requirements.Under the supervision of the supervisory unit.All the work can be carried out scientifically and reasonably, the probability of non-standard construction problems is greatly reduced, and the overall quality of the steel structure can be effectively guaranteed.The construction party should establish a sound supervision and management mechanism, encourage the relevant construction personnel to supervise each other, cultivate their sense of crisis and rigorous work attitude, and ensure the rationality of construction.
3,Strengthen construction material management
The quality of materials is directly related to the construction quality and is an important content of construction quality control.In the construction of steel structure project, the cost of steel structure material is very high.Strengthening the construction material management reduces the construction cost while ensuring the subsequent steel structure construction activities are carried out in an orderly manner.This requires comprehensive consideration of construction needs and selection of high quality and inexpensive materials.Specialists conduct in-depth market research, compare and analyze the materials, lay the foundation for more orderly implementation of subsequent steel structure construction activities, and effectively improve the construction quality of steel structure projects.
4,Strengthen the quality control of on-site steel structure components
At the same time, the quality control of on-site steel structure components should be strengthened.First of all, check the samples provided by the permanent representatives and supervisors.If any problem is found, the factory should be notified at one time for correction and to ensure the quality of steel structure components can be transported.On the other hand, the steel structural members need to be inspected by the quality inspector of the supervisory unit upon arrival at the site.
transport
FAQ
1. Are you manufacture factory or trading company?
We are manufacture factory, located in Qingdao city, near to Qingdao port. And we have total 7 workshops from steel structure to wall and roof sheet.
2. Can you provide free design?
Yes, we have 10 senior engineer with rich experience. You only need to give me youridea, we will design for you with free.
3. Can you offer competitive prices?
If you have no special requirement for the material, we all use materials from big material manufacture companies. We also can design it according to your requirement. But no matter what kind of quotation mode, offering the reasonable
price is our business objective.
4. How to install? Can you provide engineer to help?
We will provide the detail installations , like the CAD, 3D tekla, etc. Or we will provide the engineers to help according to your requirement.
5. Can I have a visit to your factory before the order?
Why not? Welcome to visit our factory. You can fly to Fujian Quanzhou Airport, then we will pick you up at the airport, hotel booking service is available.
6. ls your price competitive compared with other companies?
A:Our business objectives are to give the best price with same quality and best quality with the same price. We will do everything we can to reduce your cost and guarantee you get the best product that you paid for.
7. Do you accept container loading inspection?
A:You are welcomed to send an inspector, not only for the container loading, but any time during theproduction time.
8. Do you offer designing service for us?
A:Yes, we could design full solution drawings as your requirements.By using Auto CAD,PKPM ,3D3S,Tekla Structures (X steel) etc., we can design complex industrial building like office mansion, super marker, auto dealer shop,shipping mall, 5 stars hotel.
9.What is the delivery time?
A:Delivery time depends on order quantities.In general, the delivery time to nearest seaport in China will be 30 days after receiving deposit.
10.How can you get a quotation for your projects?
A:You can contact us by email, phone, TM, WhatsApp and so on 24*7 and you will get reply within 8 hours. Firstly, please send us your project details and your requirements. Then we will design accordingly, free of charge.Afterwards, please check and confirm whether you like the drawings. If not, we shall get the drawings revised until your confirmation.
Send your inquiry directly to us